Important Things to Know About Tampa Paver Installation

Installing Brick Paver:

Preparation tools
Before the day you begin your paver installation, arrange to hire a brick masonry saw and flat plate vibrator! Several simple working tools such as carpenter level, tape measure, rubber mallet, rake, shovel, timber stakes, string line, broom, protection eyewear, 1 x 10 foot pipe, and 2 x 1 inch diameter piping lengths are required. You may want to check out Tampa paver installation for more.

Site Preparedness
The most significant single step of the whole pavement construction appears to be the subsoil and paver bed planning. The overall strength of the pavement system depends on the proper preparation and positioning of the subsoil and base materials.

Mark the area to be paved by placing wooden stakes around the area and then spray aerosol paint to identify the area to be excavated.

Deposit
Set the grade levels by securing a line of string between the stakes, making sure to slope the grade away from any structure. This will ensure that rainfall drainage does not infiltrate into any adjacent building structures. For every eight feet of pavement length set the grade at two inches in height.

Excavate Location
Now excavate the top soil and subsoil with the shovel and to a depth of at least 10 inches in total within the staked out area. This will allow a base material of five inches to be placed at the bottom of the excavated trench, next will be one and a half inches of setting sand to be placed on top of the base material and then allow for three and a half inches to be placed on top of the setting sand for the thickness of the clay brick paver.

Source Content Lightweight
Compact the bottom of the trench with the vibrator plate machine to form a firm basis for the base materials. Place 3/4 inch quarry gravel as the base material and compact it again with the vibrator plate machine to provide a solid base for the setting sand to sit over it.

Laying the land
Lay the 2 pipe lengths 8 feet apart and parallel to one another. Place the sand between the two lengths, at a height of one and a half inches. Instead use the wooden range of 2×4, making sure the sand even down. If you see any low spots add more sand. Make sure that any large sand patches are leveled out too.

Once you’ve done leveling the sand make sure you DO NOT Compress THE SAND-as you ‘ll later compress the bedding sand with the clay brick pavers while using the vibrator in the final stages of the system. The final compaction of the pavers and bedding sand is needed to allow the proper method of interlocking to take effect. It is the basis for the strength of the interlocking pavement system, because the movement of the sand into the bottom and between the clay paver joints makes them bond together firmly and carry the loads applied to the clay brick pavers in unison.